top of page

ARCH 301

OLYMPIC SWIMMING POOL

2pers4bitmiÅŸ_optimized.png

INSTRUCTORS  BURKAY PASIN   ONURCAN ÇAKIR   CANSU GÜNAYDIN

       This olympic swimming pool project in Karşıyaka, Ä°zmir; It consists of three main parts: olympic pool, management and spa. In addition, this building, which includes different facilities such as gym, bath, thermal pool and massage rooms, is divided into three main parts. In this way, the building was provided to be used continuously and made more open to the public. 

       The building has two entrances opening to two different roads, front and back. The façade facing north faces the façade with tram and bus stops. The masses are also oriented to look at these stops and invite people to the building.

 

perspektif3.png

Perspective Section

 

ARCH301_PERSPEKTIFson1.png

Render

 

ELEV1.png
bottom of page